View Single Post
  #2  
Old August 2nd 2018, 17:06
eskamobob1 eskamobob1 is offline
Registered User
 
Join Date: Jul 2018
Posts: 7
The Build

Outline:
Green = Done
Blue = Parts Obtained
Red = Not Done
Phase 1
Suspension
  • ball joint and tie rod end replacement
  • KYB soft ride gas shocks
  • Front and rear 3/4" swaybar
Interior
  • Locate gas smell
  • Better front seats
  • Begin mock up of dash panels (3d print test fits?)
  • Install lighter port
Misc
  • Full inspection of electrical system
  • Repair turn signal switch
  • Upgrade headlights/install stealth light bar
Phase 2
944 Conversion
  • Obtain donor parts
  • Have front spindles and hubs machined and order replacement rotors and pads
  • Decide on MC
  • Finalize wheels and tires
  • Install Conversion
Exterior
  • Black out Trim and smoke light covers
  • Wolfsburg emblems for wheels
  • Front damn
  • Fastback Window Cover (?)
Interior
  • Walnut Steering Wheel
  • Walnut Formula Vee Shifter
  • Make Dash Panels
Phase 3
Body Off Restoration
  • Fix all Rust
  • Patch Paint/Repaint
  • Replace Cracked Dash pad
  • Install New Carpet
Drive train
  • Engine
  • Transmission

Last edited by eskamobob1; August 2nd 2018 at 17:45.
Reply With Quote