GermanLook Forums  

Go Back   GermanLook Forums > Technical Section > Engines

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old January 1st 2010, 02:03
wrenchnride247's Avatar
wrenchnride247 wrenchnride247 is offline
Registered User
 
Join Date: Dec 2005
Location: Cleveland,TN
Posts: 1,272
Running fuel lines in tunnel.

I put this in the engine section because it can be used with carb's, or fuel injection for any motor transplant (as long as the motor stays in the back) For my motor I needed to run two lines (feed and return for EFI)

This is 3/8" 304 SS .023 wall tubing with -6 AN SS fittings welded to the ends (not for the novice welder to attempt please) Each line was argon purged during welding and then pressure tested @90 psi. for 20 minutes each. This test was done after welding fittings on tube, and then again after welding fittings to frame. Some of the bends had to made AFTER the tube was installed in the tunnel. Mainly the ones at the bulk head as I fed mine in from the frame horn end. Also, important to secure the lines somewhere in the middle of the run (I used the old tab from the clutch tube I cut out) You will have to cut two holes big enough to work with in the passenger side of the tunnel to help with this modification.





__________________
1970 T1 W/MassIVe 2913cc RAT/?EFI? w/direct fire (very soon) and 915 trans

1962 SC 1776cc SP 944NA brakes, 993 wheels

VKG
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 15:25.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved