GermanLook Forums  

Go Back   GermanLook Forums > General > Project Builds

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old September 28th 2010, 20:28
volkdent's Avatar
volkdent volkdent is offline
Moderator
 
Join Date: Oct 2002
Location: Santa Rosa, CA, USA
Posts: 1,685
Not a smidge, I've had a non-productive summer except for the paint, some purchases, and the engine compartment fabrication.

I really got slowed down after the paint didn't turn out, it really took the wind out of my sails to put a lot of time in putting things back together only to find out I had to pull it all apart again.

Just the week after the paint was done I had a 5 hour sinus surgery at UCSF. It has really helped me a lot but took a lot out of me from the general anesthetic and healing combined with another post-op sinus infection. Then travelling, got sick, now it's 105 today! I think this weekend might be the back to work weekend.

The next bottleneck is that before I get it repainted I want to get the roll cage done, and before I get that done I need to fabricate some connectors that allow the rollcage to actually bolt to the front suspension subframe. That's on me, so once I fabricate those I can bug the roll cage guy to take on my project, then as soon as that's done the painter is ready to repaint, and blah blah blah, the project moves on!

Jason
__________________
If I could just get paid for my sleepless nights....
1960 VW Bug UBRDUB
Walkaround
1st Drag Run

Dyno Run
Oval Ragster-'57 Rag/'04 Boxster S
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 20:58.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved