![]() |
|
|
|
#1
|
||||
|
||||
|
almost finished welding
finished clearencing for the 915 box.
torsion tubes in place 5mm needs to be removed from the inside edge new handbrake tubes need to be made. ![]() ![]() ![]() cheers malcolm |
|
#2
|
||||
|
||||
|
Looking good Malcolm
Are you going to bridge over and under the trans to tie the two sections of torsion bar housing together?Rich
__________________
http://www.ricola.co.uk |
|
#3
|
||||
|
||||
|
rich I will over the top ,the bottom if I have enough clearence to remove the transmission.
|
|
#4
|
||||
|
||||
|
I thought I had a lot of fabrication in my project but when I look at what your doing my car isn't so tough anymore
Keep the updates coming!
|
|
#5
|
||||
|
||||
|
heres the bracing to bridge the torsion tubes together and the engineer has approved it.
![]() ![]() this will be the position of the drive shafts under load. [IMG]http://i55.photobucket.com/albums/g158/malcolm_05/IMG_1041.jpg[/IMG ![]() cheers malcolm |
|
#6
|
||||
|
||||
|
another angle
![]() ![]() cheers malcolm |
|
#7
|
||||
|
||||
|
Looking good Malcolm, but I think you could get a LOT more strength into the middle by closing off the hole infront of the trans...
Rich
__________________
http://www.ricola.co.uk |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|