GermanLook Forums  

Go Back   GermanLook Forums > General > Project Builds

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old October 6th 2008, 14:00
V8SuperBeetle's Avatar
V8SuperBeetle V8SuperBeetle is offline
Registered User
 
Join Date: Oct 2007
Posts: 220
S10 2" drop spindles came in.



This weekend I finished welding the floor support in. Well, I didn't get to the welding underneath cause I'm not great at overhead welding. So when I take the frame apart to rebuild it I'm going to flip over the frame and tackle those welds and others.

It's been a little while since I've last welded and I was working with different rods. I had to redo a few welds cause the rods I have are coat with less coating / flux so I wasn't use to them, but quickly got the hang of it. Not the greatest weld, but looks decent.




I made some mounts for the body to bolt to. Still have to weld them in though.

Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:29.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved