GermanLook Forums  

Go Back   GermanLook Forums > General > Project Builds

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old December 18th 2010, 18:22
Sandeep's Avatar
Sandeep Sandeep is offline
Administrator
 
Join Date: Aug 2002
Location: Brampton, Ontario, Canada
Posts: 1,795
Re did the fuel system up front thanks to comments from the group ...




-8 line from the fuel tank to Aeromotive canister filter (100 micron), and then -8 to the swirl tank, -8 feed to the Bosch 044 fuel pump. Still need to run a -6 line from pump to regulator in the back, and then a -6 return line to swirl pot.



Front end complete except for plumbing up the brake / clutch hydraulics. The lines have been run, just need to terminate the fittings. Lanner is working on the new splindles, current ones are temporary so I can move the chassis around.
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 01:12.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Đ www.GermanLook.net 2002-2017. All Rights Reserved