GermanLook Forums  

Go Back   GermanLook Forums > General > Project Builds

Reply
 
Thread Tools Display Modes
  #1  
Old November 9th 2011, 10:47
aircured's Avatar
aircured aircured is offline
Registered User
 
Join Date: May 2010
Location: Teesside, UK
Posts: 52
Quote:
Originally Posted by dub_crazee View Post
i started this project october 2008 - starting with a 1976 body and 1969 chassis. I started off with a 1976 beetle i had since i was 15 - and acquired a 1969 chassis to IRS.

a couple of pics before





First up was new heavy duty floorpans and IRS conversion with 944 Turbo a arms









with this being shoe horned in next!



The chassis has also received a couple of small repairs to the framehead, a hydraulic clutch set up a a bug@5 speed shifter









the clutch MC was fitted through the inspection hole (had to be slightly enlarged) and a hole made behind the throttle lever arm cover for access





i think this is a much better way of installing it rather than cutting a large hole in the top of the tunnel as suggested
have you got any more information about the hydraulic clutch installation.
cheers
__________________
'72 Type 1 - GT
'69 Type 2 - Bay
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 2 (0 members and 2 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 14:05.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
© www.GermanLook.net 2002-2017. All Rights Reserved